is where we rebuild and retrofit all of the Fellows Machines, including spare parts. Machines are retrofitted with either the Mitsubishi or FANUC Controller.
 
 

Ways reground, cutter spindle plated and reground to original specification, work table reground, work slide ways reground and hand scraped with table for perfect fit. Both upper and lower worm and worm gear inspected and set with optimal back lash. All, worn and/or broken parts replaced, machine cleaned, checked, cycled, and painted. Ready for your run off.

The FELLOWS gear shapers will be capable of performing within the original manufactures precision parameters when the machine was delivered new.

Options include (10 series)

  • 3" 6" or 9" additional risers
  • Vatiator Infinitely variable stroking speeds.
  • Cutter elevation
  • Hydraulic work clamping
  • one axis CNC
  • four axis CNC
  • Fine adjusting clutch for cutter alignment
  • Tailstock
  • 4" or 5" stoke

Additional options for (20 series)

  • 3.9" or 7.8" additional risers
  • Custom 4" cutter spindle
  • Extending stroke from 4" to 5"
  • Extending stroke from 4" to 6"
   
 

is where we rebuild/ retrofit the Klingelnberg gear testers with the TriCheck system. The TriCheck PC Based Analytical Gear Inspection. The PC upgrade replaces the existing chart recorders on Klingelnberg, Hofler Maag, Gear TestersType of evaluation DIN, AGMA, K-Chart, Crowning, Custom.

Also in Cleveland We Rebuild The Klingelnberg Hob Sharpeners

     
 

All items listed are completely gone through and brought up to OEM specifications replaced/rebuilt etc.as required.

Work Spindle Assembly:, Differential Assembly:
Infeed Assembly: -Tailstock Assembly:
Work Slide and Main Support Assembly, Wheel Head and Dressing Assembly
Radial Infeed Assembly
:Hydraulics: